Home > Products > CNC parts > Details

Alloy Steel Ring Rolled Forgings Mechanical Components

SEND INQUIRY

CNC services can solve various problems for you. If you want to learn more about CNC technology and prototype services, please call or email us. We are happy to provide you with professional and efficient services.

  • MOQ: 100PCS
  • Certificate: ISO
  • Service: OEM & ODM CNC Machining Service
  • Package: Plywood/Carton

Project Details

Specification

Product Name Mechanical Components
Material Carbon Steel, Stainless Steel, Alloy Steel, Steel
Size Customer's Demand
Tolerance +/-0.005~+/-0.001mm
Processes Sand Casting, Investment Casting, Precision Casting, Forging, Stamping, CNC Machining
Surface Treatment

Zinc Plating, Hot Galvanized, Powder Coating, Shoot Blasting

Application

Mining Accessories, Machinery Accessories, Truck Parts, Auto Parts, Industrial Parts.

Delivery Time 10-15 Work Days

Our Services

  • Drawing: We can translate your original drawings, make manufacturing procedures, offer the best suggestions on the design.
  • Quality: We have a full set of quality control systems to guarantee the best product quality. Depending on the products, we can make different Item testing plans, Manufacturing procedures, etc.
  • Inspection: We have professional, qualified inspectors, who will make sure that all the products are qualified.

FAQ

Q1. Are you a trading company or manufacturer?

A1: We are a manufacturer.

Q2. How can I get the quotation?

A2: Please send us information for a quote: drawing, material, weight, quantity and request, we can accept PDF, ISGS, DWG, STEP file format. If you don't have a drawing, please send the sample to us, we can quote based on your sample too.

Q3. What's your MOQ?

A3: In general 100pcs, but can accept low quantity in some special conditions.

Q4. Do you provide samples? is it free or extra?

A4: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q5. What if the parts are not good?

A5: We can guarantee good quality, but it happened, please contact us immediately, take some pictures, we will check on the problem, and solve it asap.

Q6. What about the leading time for mass production?

A6: Honestly, it depends on the order quantity. Normally, 15 to 20 workdays after got your deposit if no tooling needed.

Increase your "value", Everything is for the future!

Loading